July 17, 2013
Everton Bridge Landscaping Progress Report
Despite being approved by the Master Board in the Spring, a series of delays has postponed Goetz's installation of the bridge's landscaping. At this point, irrigation pipes must be bored under the road before the other work can begin.
Newer Post
Older Post
Home